Garden Design in Brislington Part Four

We’ve been working on this long, back garden in South Bristol for a few weeks now. The structural elements are now coming together, as we see this garden design begin to take shape.
20261112 093003

Share This Post

20261109 110609

With the new, upper and lower patio areas completed at the back of the house, and the construction of the new, shed well under way, the boys moved their attention to scalping turf and digging out soil, to create the right levels going down the garden.

20261109 110703

The line of turf where the new, pathway will sweep down the garden is also removed. Although we cannot get our truck down the narrow, back lane at the back of the garden, we were able to bring a mini digger down it. This was very helpful, especially considering all of the waste is going out through the house to a skip in the front driveway.

20261109 110810

20261109 110830

It’s been a tough, physically demanding job, but it makes it all the more satisfying when you see it start to change and transform. Lines were marked out for the pathway, to work out where it would move through the space.

20261111 084243

20261111 084302

A small, patio, which matches the rest of the paved areas is constructed mid way down the garden. This will be cut into a circular, patio.

20261111 084409

20261111 084346

Whilst the pathway was being worked on, at the bottom of the garden, the team started to plan out the construction of the base of a bespoke, garden room, which is anchored into the ground below.

20261111 144116

20261111 144209(0)

20261111 144258

20261111 144313

20261111 144333

The boys have had a lot of pointing to do on the paving, with some dry days being helpful for this aspect. At the top of the garden, the scratch coat is included on the newly, rendered, retaining wall.

20261112 093133

20261111 144654

20261112 093250

Coming back to this garden, and seeing the pathway and circular patio finished, looking golden after the rain was really good. If you’d like to see what this garden looked like at the start of the project click here. There are multiple posts to this story.

20261117 083108

20261117 083142

The shed construction by the back of the house now has the concrete lower walls, and the upper timber section. The roof will be constructed from corrugated metal, with a window included on the side.

20261117 083301

20261120 085105

Down at the bottom of the garden, the garden room was still under construction. We brought in Pir insulations boards, which are  high performance, rigid foam board used for floors, walls and roofs. Jerry, Sam and Alfie got busy constructing the timber frame.

20261120 084853

20261112 093226

By this point, this project is really coming into it’s own and is getting more exciting to see upon each visit.

20261120 085026

20261120 085129